Services  

        

                             

        

    

Ruo Consultants aims to be among the best engineering service providers in Malawi and beyond by providing added value throughout the entire detailed process of Consulting and Design, Engineering, Contracting, Project Management and Asset Management.

We are registered with the Registrar of Companies, the Malawi Revenue Authority, the Office of the Director of Public Procurement, and the Malawi National Construction Industry Council. We maintain Professional Indemnity insurance with National Insurance Company of Malawi, and details can be made available on request.

 

Both in house staff and our pool of short term experts are well placed to perform the following type of services:

 

Building Planning Consultancy

    • Building Planning services.
    • Design.
    • Construction management and supervision.
    • Asset management: renovation requirements and asset renewals.
    • Geotechnical, construction materials and foundation engineering.

 Roads/Highway Consultancy

    • Road and Bridges Design.
    • Road Works construction management and supervision.
    • Geotechnical and construction materials engineering.
    • Transportation studies.
    • Asset audit and renewal studies.

Water, Irrigation and Sanitation Consultancy

    • Water supply and wastewater transmission systems design.
    • Construction supervision.
    • Asset audit/renewal studies.
    • Irrigation works planning, design, construction supervision and management.
    • Capacity building services to national, district and community institutions in water, irrigation and sanitation planning and implementation.
    • Sanitation and Hygiene studies.

   Water Consultancy References

  • Supervision of Construction Works for Balaka Water Supply Scheme for Southern Region funded by the World Bank which include: i) Drilling of new boreholes.; ii) laying of transmission line with a tentative total length of 6.6km, 200mm diameters PVC pipe; iii) construction of one storage reservoirs with 1500 m3 capacity; iv) laying of distribution pipelines with a total length of 23.987 km with pipe diameters ranging from 300 mm to 63mm PVC pipes; v) two pressure filter and 50 m3 elevated tank for backwashing and; vi) Auxiliary buildings. Completion October 2013.

  • Supervision of Construction Works for upgrading of Chileka water pumping station and Walker’s Ferry Intake and Treatment Works for Blantyre Water board. Completion August 2014.

  • Design of foundation for a 4,000m3 ground level steel water tank, design of reinforced concrete stand and foundations for 2No. 80m3 elevated tanks, and supervision of construction for Carlsberg Malawi Brewery Limited. Completion May 2013.

  • Detailed Engineering Design for the Proposed Augmentation of Ngozi Water Supply Scheme in Dedza and Salima for World Vision Malawi. Completion date is 06/2012. 
  • Preparation of National 10 Year Sanitation and Hygiene Investment Plan and Strategy for Malawi. The project was funded by Malawi Government and The African Development Bank. The Client is The Ministry of Agriculture, Irrigation and Water Development. Completion date is 04/2012
  • Development of Monitoring Tools on Blantyre Peri-Urban Water Supply and Sanitation Project. The assignment was financed by Water for People and was completed in 04/2010.

   Roads / Highway Consultancy References

  • Design and Supervision of Construction of a pedestrian crossing overpass across Masauko Chipembere Highway at Queen Elizabeth Central Hospital. The Client is Alliance Media and completion date is 12/2012.
  • Structural Assessment of pedestrian crossing overpass in four locations in Blantyre and Lilongwe. The Client is Continental Outdoor Media and completion date is 10/2012.

Building Planning and Structures Consultancy References

This presentation is a selection from the various projects undertaken by the Building Planning and Structures Consultancy

  • Design (Jan-May 2013) and Supervision of Construction (August 2013-July 2014) of Urban Infrastructure Local Development Fund Project funded by Malawi Government and KFW: Balaka District four market centres, Mangochi District Multi Purpose Hall, Nkhata Bay (Usysia) Market Centre and Ntcheu district Bus Depot
  • Design and Construction Supervision of a warehouse in Chirimba, Blantyre, Malawi. The Client is Master Form and completion date is 11/2012.
  • Design and Construction Supervision of Extension works for Carlsberg Malawi factory compound infrastructure. The Client is Carlsberg Malawi and completion date is 08/2012.
  • Design and Construction Supervision of Construction of School Block for St Andrews High School in Malawi. The Client is St Andrew's International High School and completion date is 02/2012.
  • Design and Construction Supervision of Extension of existing historical building, St Michaels and all Angels Church, Blantyre Malawi. The Client is St Michaels and All Angels Church and completion date is 01/2012.
  • Design and Construction Supervision on Basic Education Infrastructure Support Programme – School Construction. The Client is Save the Children and completion date is 08/2011. 
  • Building Design on Market Linkages Initiative Grain Storage Upgrade Project in Malawi. The Client is CARANA Corporation and completion date is 07/2011.
  • Design and Construction Supervision of Construction of Southern Bottlers Northern Region Depot. The Client is Southern Bottlers Ltd and completion date is 08/2010. 
  • Design and Construction Supervision of Construction of Total Filling Stations in Zomba and Blantyre cities. The Client is Total Malawi Ltd and completion date is 08/2010.

 

 

 

       © Ruo Consultants.